A KD 29.7 million contract was signed to extend and construct overhead power lines in Al-Roudtain, Jahra and Saad Al-Abduallah power substations, Ministry of Electricity and Water said in a statement Tuesday. The statement said that Minister of Electricity and Water and Minister of Public Works Abdulaziz Al-Ibrahim signed this contract that will provide two 300 voltage overhead power lines in Al-Roudtain's substations (X) instead of the existing ones that connect Al-Sabiya power station with Al-Jahra's substation (X). Two other 300 voltage overhead power lines will be provided in Al-Roudtain's substation (Y) and they will be replacing old lines connecting Al-Sabiya power station with Saad Al-Abduallah substation (X). The contract also provides for the construction of two additional power lines to connect Al-Roudtain's substations (X) with (Y).