
A KD 29.7 million contract was signed to extend and construct overhead power lines in Al-Roudtain, Jahra and Saad Al-Abduallah power substations, Ministry of Electricity and Water said in a statement Tuesday. The statement said that Minister of Electricity and Water and Minister of Public Works Abdulaziz Al-Ibrahim signed this contract that will provide two 300 voltage overhead power lines in Al-Roudtain's substations (X) instead of the existing ones that connect Al-Sabiya power station with Al-Jahra's substation (X). Two other 300 voltage overhead power lines will be provided in Al-Roudtain's substation (Y) and they will be replacing old lines connecting Al-Sabiya power station with Saad Al-Abduallah substation (X). The contract also provides for the construction of two additional power lines to connect Al-Roudtain's substations (X) with (Y).
GMT 12:09 2018 Monday ,26 November
Black Friday less wild as more Americans turn to online dealsGMT 15:06 2018 Sunday ,18 November
Refugee host countries discuss UNRWA's financial crisisGMT 16:17 2018 Monday ,12 November
Egypt working on 4-year plan to increase growth rateGMT 12:45 2018 Friday ,09 November
Egyptian agriculture products introduced to Japanese markeGMT 11:42 2018 Friday ,02 November
Turkey's new mega airport, boon for slowing economyGMT 13:42 2018 Monday ,29 October
Egypt's trade volume hits $67.63 bln over 9 monthsGMT 15:13 2018 Friday ,12 October
Govt to announce incentives package for Overseas PakistanisGMT 14:46 2018 Thursday ,11 October
Economy and energy dominate agenda in Russian-Slovak relationsMaintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©
Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©
Send your comments
Your comment as a visitor