brazil shelves plans to build new nuclear plants
Last Updated : GMT 09:07:40
Egypt Today, egypt today
Egypt Today, egypt today
Last Updated : GMT 09:07:40
Egypt Today, egypt today

Brazil shelves plans to build new nuclear plants

Egypt Today, egypt today

Egypt Today, egypt today Brazil shelves plans to build new nuclear plants

Brazilia - AFP
Brazil said Wednesday it has shelved plans to build new nuclear power stations in the coming years in the wake of last year's Fukushima disaster in Japan. The previous government led by former president Luiz Inacio Lula da Silva had planned to construct between four and eight new nuclear plants through 2030. But the energy ministry's executive secretary, Marcio Zimmermann, was quoted as telling a forum Tuesday that there was no need for new nuclear facilities for the next 10 years. "The last plan, which runs through 2020, does not envisage any (new) nuclear power station because there is no need for it. Demand is met with hydro-electrical power and complementary energy sources such as wind, thermal and natural gas," Zimmermann said in remarks released by the ministry Wednesday. "The 2021 plan, as far as I know, will not consider nuclear power stations either, " he added, although he did not rule out construction of such facilities in the longer term. "After the (2011 Fukushima) accident in Japan, not just Brazil but the entire world stopped to analyze and assess," Mauricio Tomalsquim, president of the EPE energy research firm, told the same event. Tomalsquim said that in the next 10 years, the hydro-electrical contribution to Brazil's energy mix will fall from the current 75 percent to 67 percent while that of renewable energy sources -- wind, solar and biomass -- will rise from eight to 16 percent. Brazil's sole nuclear power plant, located in Angra dos Reis, a coastal town near Rio, has two pressurized water reactors in operation, with outputs respectively of 657 MWe (megawatt electrical) and 1350 MWe. After a 24-year dispute, work resumed last June on a third reactor at that facility with a projected output of 1245 MWe. It is expected to be completed in 2015. The Angras do Reis plant currently generates around three percent of Brazil's energy production, which relies overwhelmingly on hydroelectric installations. Economic expansion, however, is outstripping supply, resulting in occasional blackouts across regions. Greenpeace and other environmental lobby groups oppose broadening Brazil's nuclear program, arguing that there is potential for widespread ecological damage in case of an accident. Brazil, Latin America's dominant power, and neighboring Argentina are the only South American countries operating civilian nuclear power stations.
egypttoday
egypttoday

Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

brazil shelves plans to build new nuclear plants brazil shelves plans to build new nuclear plants



GMT 06:23 2019 Tuesday ,20 August

You find yourself facing new professional

GMT 11:47 2018 Thursday ,11 January

Heavy snowfall strands 13,000 tourists

GMT 09:23 2019 Monday ,19 August

Live an important and happy atmosphere

GMT 16:10 2018 Friday ,14 December

Bahrain press headlines For 14 Dec 2018

GMT 08:13 2017 Monday ,11 December

Shaikha Mai receives Lebanese Culture Minister

GMT 19:17 2016 Monday ,05 September

Israeli Forces Shot 3 Palestinians in Nablus

GMT 00:58 2017 Monday ,06 February

I feel calmness when reading Qur’an: Lindsay

GMT 19:40 2016 Sunday ,12 June

Greek MPs : will recognize Palestine ‘soon’

GMT 09:24 2017 Wednesday ,20 September

Talib says players need more harmony
 
 Egypt Today Facebook,egypt today facebook  Egypt Today Twitter,egypt today twitter Egypt Today Rss,egypt today rss  Egypt Today Youtube,egypt today youtube  Egypt Today Youtube,egypt today youtube

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©

egypttoday egypttoday egypttoday egypttoday
egypttoday egypttoday egypttoday
egypttoday
بناية النخيل - رأس النبع _ خلف السفارة الفرنسية _بيروت - لبنان
egypttoday, Egypttoday, Egypttoday