A reactor at a Swiss nuclear plant that automatically shut down due to a defect was brought back online Thursday evening, the operator said. "After an interruption of around 24 hours, Block 2 of the Beznau nuclear power plant will start producing electricity again tonight," operator Axpo said in a statement. It explained that "a defective safety switch in the non-nuclear part of the plant" had caused the automatic shut-down late Wednesday. The erroneous triggering of the switch had halted the flow of water into the steam generator, which had caused the reactor to shut down, it explained. "The fault was rectified by activating an identical reserve switch," it said, stressing that an inspection showed that all the components affected by the defect were now functioning well. "The Swiss Federal Nuclear Safety Inspectorate (ENSI) approved the restart of Block 2," Axpo said. Switzerland reacted swiftly to the nuclear disaster in Fukushima last year, with parliament deciding to phase out nuclear energy. Under current plans the country's five reactors will be put out of action by 2034.
GMT 16:03 2018 Wednesday ,28 November
Executive Office of Arab Ministers of Communications starts in CairoGMT 09:09 2018 Thursday ,15 November
Syria, Iran discuss enhancing scientific cooperationGMT 09:53 2018 Wednesday ,07 November
Drones bring innovation to Africa, from Morocco to MalawiGMT 11:31 2018 Wednesday ,17 October
Japan high-tech fair CEATEC opens in ChibaGMT 14:03 2018 Monday ,08 October
American scientists awarded 2018 Prize in Economic SciencesGMT 07:35 2018 Monday ,08 October
First foreign space agency opens in Abu DhabiGMT 10:47 2018 Sunday ,07 October
Bahrain hosts World Robotics Olympiad2018GMT 09:20 2018 Thursday ,04 October
UAE participates in World Space WeekMaintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©
Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©
Send your comments
Your comment as a visitor