chinas new nuclear power plant installs key component
Last Updated : GMT 09:07:40
Egypt Today, egypt today
Egypt Today, egypt today
Last Updated : GMT 09:07:40
Egypt Today, egypt today

China's new nuclear power plant installs key component

Egypt Today, egypt today

Egypt Today, egypt today China's new nuclear power plant installs key component

China's new nuclear power plant installs key component
Jinan - Xinhua

A key component of China's first fourth-generation nuclear energy system was installed in a plant in Shandong Province on Sunday.

The pressure vessel of a high-temperature gas-cooled reactor (HTGR) was put in place at the Huaneng Shidao Bay nuclear power plant.

The cylindrical vessel, 25 meters high and weighing 610 tons, is the biggest, heaviest and most complicated pressure vessel for a nuclear reactor, according to a statement from Huaneng Shandong Shidao Bay Nuclear Power Co. (HSNPC), the plant's builder and operator.

In line with the fourth-generation concept, the reactor can shut down safely in the event of an emergency without causing a reactor core meltdown or large leak of radioactive material.

With a designed capacity of 200 megawatts, the reactor will start generating power by the end of 2017.

It is predicted that 91 percent of the equipment in the plant will come from Chinese companies, said He Yunsheng, general manager of HSNPC.

"The high-temperature gas-cooled reactor represents the latest technology. It will greatly raise China's capacity in nuclear power plants and boost export," said He.

China has inked memoranda of understanding with Saudi Arabia and the UAE on co-construction of HTGR nuclear power plants.

Source: Xinhua

egypttoday
egypttoday

Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

chinas new nuclear power plant installs key component chinas new nuclear power plant installs key component



GMT 08:34 2017 Saturday ,26 August

Fares happy for participating in Damascus’ concert

GMT 20:13 2015 Monday ,14 September

Morsi trial in espionage case adjourned to Thurday

GMT 09:45 2017 Tuesday ,19 December

Egypt should reconsider its relationship with Russia

GMT 04:16 2017 Monday ,08 May

Priyanka Chopra dismayed

GMT 15:02 2018 Friday ,19 October

Six dead in fire at Rohingya camp in Myanmar

GMT 11:11 2013 Thursday ,14 February

Diamonds are forever

GMT 08:29 2017 Sunday ,12 November

Trump calls Kim Jong-un 'short and fat'

GMT 03:52 2012 Tuesday ,03 April

CMA awards best dressed list

GMT 13:01 2012 Tuesday ,17 January

Ewan releases new clip

GMT 07:40 2017 Sunday ,05 November

White House OKs report warning climate change
 
 Egypt Today Facebook,egypt today facebook  Egypt Today Twitter,egypt today twitter Egypt Today Rss,egypt today rss  Egypt Today Youtube,egypt today youtube  Egypt Today Youtube,egypt today youtube

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©

egypttoday egypttoday egypttoday egypttoday
egypttoday egypttoday egypttoday
egypttoday
بناية النخيل - رأس النبع _ خلف السفارة الفرنسية _بيروت - لبنان
egypttoday, Egypttoday, Egypttoday