chinas new nuclear power plant installs key component
Last Updated : GMT 09:07:40
Egypt Today, egypt today
Egypt Today, egypt today
Last Updated : GMT 09:07:40
Egypt Today, egypt today

China's new nuclear power plant installs key component

Egypt Today, egypt today

Egypt Today, egypt today China's new nuclear power plant installs key component

China's new nuclear power plant installs key component
Jinan - Xinhua

A key component of China's first fourth-generation nuclear energy system was installed in a plant in Shandong Province on Sunday.

The pressure vessel of a high-temperature gas-cooled reactor (HTGR) was put in place at the Huaneng Shidao Bay nuclear power plant.

The cylindrical vessel, 25 meters high and weighing 610 tons, is the biggest, heaviest and most complicated pressure vessel for a nuclear reactor, according to a statement from Huaneng Shandong Shidao Bay Nuclear Power Co. (HSNPC), the plant's builder and operator.

In line with the fourth-generation concept, the reactor can shut down safely in the event of an emergency without causing a reactor core meltdown or large leak of radioactive material.

With a designed capacity of 200 megawatts, the reactor will start generating power by the end of 2017.

It is predicted that 91 percent of the equipment in the plant will come from Chinese companies, said He Yunsheng, general manager of HSNPC.

"The high-temperature gas-cooled reactor represents the latest technology. It will greatly raise China's capacity in nuclear power plants and boost export," said He.

China has inked memoranda of understanding with Saudi Arabia and the UAE on co-construction of HTGR nuclear power plants.

Source: Xinhua

egypttoday
egypttoday

Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

chinas new nuclear power plant installs key component chinas new nuclear power plant installs key component



GMT 04:51 2014 Sunday ,28 September

China largest car consumer and producer in the world

GMT 09:51 2019 Monday ,19 August

Live a frustrating atmosphere in your career

GMT 18:36 2017 Friday ,28 July

Two Syrian soldiers killed in fight

GMT 11:46 2012 Tuesday ,24 April

The Hollywood Sign by Leo Braudy

GMT 12:55 2015 Tuesday ,17 March

7 best foods to eat before an important meeting

GMT 14:31 2017 Tuesday ,10 October

Foreign minister receives former UK Premier

GMT 17:22 2012 Thursday ,26 January

Thales teams with Steyr Mannlicher

GMT 00:44 2017 Sunday ,08 January

Where to get insurance cover for domestic workers

GMT 12:41 2013 Saturday ,24 August

Egyptian tourism minister visits Hurghada

GMT 14:26 2018 Wednesday ,12 December

Canada standing on the wrong side of history
 
 Egypt Today Facebook,egypt today facebook  Egypt Today Twitter,egypt today twitter Egypt Today Rss,egypt today rss  Egypt Today Youtube,egypt today youtube  Egypt Today Youtube,egypt today youtube

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©

egypttoday egypttoday egypttoday egypttoday
egypttoday egypttoday egypttoday
egypttoday
بناية النخيل - رأس النبع _ خلف السفارة الفرنسية _بيروت - لبنان
egypttoday, Egypttoday, Egypttoday