
Prime Minister Abdelmalek Sellal has inaugurated Monday in Bethioua, a new production plant of Liquefied Natural Gas (Train LNG 3), in the industrial zone of petrochemistry of Arzew (Oran).
Alternate to the complex (GL4/Z called "La Camel", the world’s first LNG plant closed in 2010 after 46 years of activity, this new industrial plant, built on land base of 54 hectares should contribute to the development of the capacity of the national production of the natural liquefied gas.
This plant has a production capacity of 4.7 million metric tonnes of LNG, 58,000 tonnes of butane, 275,000 tonnes of propane gas, 300,000 tonnes of ethane, 47,000 tonnes of de gasoline and 115.5 normal cubic meters (Nm3) of helium-enriched gas.
On the social plan, this investment, funded by Sonatrach for $4 billion, i.e. DZD304 billion plans the creation of 645 direct jobs and 250 indirect ones.
The Prime Minister’s visit to Oran coincided with the loading of a LNG carrier with a capacity of 125,000 tonnes.
GMT 12:00 2018 Wednesday ,28 November
6th Gulf Intelligence Oman Energy Forum opensGMT 13:32 2018 Thursday ,22 November
Russia's Sovcomflot considers acquiring LNG-fueled shipsGMT 08:21 2018 Monday ,19 November
Russia expects new joint energy projects with VietnamGMT 09:34 2018 Sunday ,18 November
US, Japan, Australia, NZ to bring electricity to Papua New GuineaGMT 11:38 2018 Thursday ,08 November
World Bank member offers 71 mln USD for building wind power plant in JordanGMT 12:27 2018 Friday ,02 November
Proportion of renewable energy reaches 38 per cent in GermanyGMT 12:26 2018 Friday ,02 November
Proportion of renewable energy reaches 38 per cent in GermanyGMT 07:01 2018 Tuesday ,09 October
First high-level renewable energy conference to kick off in Cairo TuesdayMaintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©
Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©
Send your comments
Your comment as a visitor